Support #438

open

OAM: Wazuh full rebuild on tsys-siem (corrupted installation)

Support #438: OAM: Wazuh full rebuild on tsys-siem (corrupted installation)

Added by Charles N about 18 hours ago. Updated about 3 hours ago.

Status:
New
Priority:
Normal
Assignee:
-
Start date:
08/12/2026
Due date:
% Done:

0%

Estimated time:

Description

Parent: #422 (BUG: tsys-siem apt-get update failing on wazuh package repo)

Background

Diagnosis of #422 revealed the Wazuh installation on tsys-siem (VM 707 on tsys7) is critically broken. All three packages (indexer, manager, dashboard) have missing files — binaries, configs, and data directories are all absent despite dpkg showing them as 'installed'. This is an aborted/corrupted installation requiring a full rebuild.

Scope

  1. Add official Wazuh 4.x apt repository + GPG key to tsys-siem
  2. Purge all existing wazuh-* packages (clean slate)
  3. Fresh install: wazuh-manager, wazuh-indexer, wazuh-dashboard (v4.14.x)
  4. Install OpenJDK (prerequisite for indexer)
  5. Configure indexer: certificates, cluster/network settings
  6. Configure manager: API, auth, integrations
  7. Configure dashboard: connect to indexer + manager
  8. Enable + start all services
  9. Verify: indexer cluster health, manager agent readiness, dashboard UI accessible

Deployment decisions (awaiting user input)

  • Single-node vs distributed deployment?
  • Certificate strategy (self-signed via wazuh-certs-tool vs internal CA #342)?
  • Integration with LibreNMS (#337) for alert forwarding?
  • Retention policy for security events?

Related

  • #422 (parent — apt repo diagnosis)
  • #314 (OAM alerts umbrella)
  • #335 (centralized syslog to Wazuh)
  • #343 (monitoring coverage matrix)

Updated by Charles N about 3 hours ago Actions #1

  • Tracker changed from Bug to Support

Updated by Charles N about 3 hours ago Actions #2

[#438] Parent umbrella: #314 (OAM Alerts and delivery thereof).