Support #307
Updated by Charles N 2 days ago
* Plug in last two server power cables * Deploy environmental and security sensors in server room (in progress) * Finish deploying (zwave/zigbee/proprietary) sensors (temp / humidity / door / window / alarm keypads) in server room / elsewhere * Badge control server room door * Add storage NIC to Ultix * Add IDS sniffing NIC to tsys1 - Put UPS batteries on tenders , so medium UPS units can possibly be rebuilt - max out ram on the best two or three Dell servers (r series) and get idrac configured so the servers can be used for RackRental / STL - Ensure the switch ports with the Dell Server secondary ethernet interfaces are set to storage vlan ## Todo - Put UPS batteries on tenders , so medium UPS units can possibly be rebuilt - max out ram on the best two or three Dell servers (r series) and get idrac configured so the servers can be used for RackRental / STL - Ensure the switch ports with the Dell Server secondary ethernet interfaces are set to storage vlan - Add IDS sniff interface to tsys - Figure out Ultix hard drives ## In Progress - Plug in hard drive bay to tsys1 to pull Axios and other data from old file server (plugged in, dmesg complained, need to investigate) - Suboi5 online - Ensure storage VLAN is setup, port channels configured (r3-stor,pfv-core-sw01) (4 gigabit bond) - pfv-core-sw01 25,26,27,28 - r3-stor 20,21,22,23 s,20 -> c,25 s,21 -> c,26 s22 -> c,27 s23 -> c,28 (Above is in heavy progress, ethernet connections are in place, just config work now)