Support #307
Updated by Charles N 2 days ago
## Art room - * Get OpenScan 3d scanner power supply located and paired and the system on-net for use (power supply adapter ordered) - * Inventory art room - Re-hang art room door ## Server room ### Complicated/involved - (in progress) Figure out how to get all five Ultix hard drives showing up (only 3 show up currently) (need to play with BIOS/controller bios settings) - (in progress) Plug in hard drive bay to tsys1 to pull Axios and other data from old file server (plugged in, dmesg complained, need to investigate) - Deploy environmental and security sensors in server room (in progress) - Finish deploying (zwave/zigbee/proprietary) sensors (temp / humidity / door / window / alarm keypads) in server room / elsewhere - Badge control server room door ### Simple - Add trim to server room door - Add stop to storage room door - Add storage NIC to Ultix - Add IDS sniffing NIC to tsys1 - Put UPS batteries on tenders , so medium UPS units can possibly be rebuilt - max out ram on the best two or three Dell servers (r series) and get idrac configured so the servers can be used for RackRental / STL - Ensure the switch ports with the Dell Server secondary ethernet interfaces are set to storage vlan - Plug in last two server power cables - max out ram on the best two or three Dell servers (r series) and get idrac configured so the servers can be used for RackRental / STL - Ensure the switch ports with the Dell Server secondary ethernet interfaces are set to storage vlan ## Garage - Put UPS batteries on tenders, so medium UPS units can possibly be rebuilt - Get Suboi5 online - Inventory tools/equipment/machines - Deploy cable runners on floor - Fix aircon vent hose connection to garage wall vent