Support #307

Updated by Charles N 1 day ago

 
 ## Art room 

 - Get OpenScan 3d scanner power supply located and paired and the system on-net for use (power supply adapter ordered) 
 - Inventory art room 
 - Re-hang art room door 

 ## Server room  

 ### Complicated/involved 

 - (in progress) Figure out how to get all five Ultix hard drives showing up (only 3 show up currently) (need to play with BIOS/controller bios settings) 
 - (in progress) Plug in hard drive bay to tsys1 to pull Axios and other data from old file server    (plugged in, dmesg complained, need to investigate) 
 - Deploy environmental and security sensors in server room (in progress) 
 - Finish deploying (zwave/zigbee/proprietary) sensors (temp / humidity / door / window / alarm keypads)    in server room / elsewhere  
 - Badge control server room door 

 ### Simple 
 - Add storage NIC to Ultix 
 - Add IDS sniffing NIC to tsys1 
 - Plug in last two server power cables  
 - Ensure the switch ports with the Dell Server secondary ethernet interfaces are set to storage vlan 
 - max out ram on the best two or three Dell servers (r series) and get idrac configured so the servers can be used for RackRental / STL  
 - Add trim to server room door  
 - Add stop to storage room door  


 ## Garage 
  
 - Put UPS batteries on tenders, so medium UPS units can possibly be rebuilt  
 - Get Suboi5 online 
 - Inventory tools/equipment/machines  
 - Deploy cable runners on floor 
 - Fix aircon vent hose connection to garage wall vent 