## IT Punch List  

 ### IT-Art Room 

 - Give art room canon multi function unit a static IP address (in progress, powered it on, connected to USB to re-run setup).  

 ### IT-Server Room 

 - Add storage dual gigabit NIC (dual gigabit Intel) to ultix 
 = - Ensure the two ports the ultix storage NIC is connected to are in a bond on storage VLAN on pfv-core-sw01 
 - Ensure the two ports the tsys1 storage NICs are is connected and port set to are in a bond on storage VLAN on pfv-core-sw01 vlan 
 - Ensure tsys3,4,5 have two of their four interfaces connected to the r3 storage switch 
 - Ensure 2 port LACP storage bond exists for tsys3,4,5 on r3 storage switch 

 
 - Get subopi(x) units (back) subopi1 and subopi2 online 

 
 - On net Cisco 2800 

 
 - Get all switches setup for remote login (currently they are console only via ultix) 


 ### IT-Garage 

 - Get subopi(x) units (back) Suboi5 online 

 


 ## Facilities Punch List 

 ### Facilities-Art Room 
 - Re-hang art room door 
 - Deploy cable runner over speaker wire in game room 
 - Cleanup art room floor (scrape up paint) 

 ### Facilities Server room  

 - Deploy environmental and security sensors in server room (in progress) 
 - Finish deploying (zwave/zigbee/proprietary) sensors (temp / humidity / door / window / alarm keypads)    in server room / elsewhere  
 - Badge control server room door 
 - Add trim to server room door  
 - Add stop to storage room door  

 ### Facilities Garage 
  
 - Deploy cable runners on floor 
 - Fix aircon vent hose connection to garage wall vent 
 - Assemble, deploy and use TDS tester to test de-ionizer 