Support #307
Updated by Charles N 29 days ago
## IT Punch List ### IT-Art Room - Give art room canon multi function unit a static IP address (in progress, powered it on, connected to USB to re-run setup). ### IT-Server Room - Add storage NIC (dual gigabit Intel) to ultix - = Ensure the two ports the ultix storage NIC is connected to are in a bond on storage VLAN on pfv-core-sw01 - Ensure the two ports the tsys1 storage NICs are connected to are in a bond on storage VLAN on pfv-core-sw01 - Ensure tsys3,4,5 have two of their four interfaces connected to the r3 storage switch - Ensure 2 port LACP storage bond exists for tsys3,4,5 on r3 storage switch - Get subopi(x) units (back) online - On net Cisco 2800 - Get all switches setup for remote login (currently they are console only via ultix) ### IT-Garage - Get subopi(x) units (back) online ## Facilities Punch List ### Facilities-Art Room - Re-hang art room door - Deploy cable runner over speaker wire in game room - Cleanup art room floor (scrape up paint) ### Facilities Server room - Deploy environmental and security sensors in server room (in progress) - Finish deploying (zwave/zigbee/proprietary) sensors (temp / humidity / door / window / alarm keypads) in server room / elsewhere - Badge control server room door - Add trim to server room door - Add stop to storage room door ### Facilities Garage - Deploy cable runners on floor - Fix aircon vent hose connection to garage wall vent - Assemble, deploy and use TDS tester to test de-ionizer - Setup knife sharpener