Support #307
Updated by Charles N 17 days ago
## IT Punch List ### IT-Art Room - Give art room canon multi function unit a static IP address (in progress, powered it on, connected to USB to re-run setup). (due 2025-08-18) ### IT-Server Room - Ensure the two ports that the ultix storage NIC is connected to are in a bond on storage VLAN on pfv-core-sw01 (due 2025-08-18) - Ensure tsys3,4,5 have two of their four interfaces connected to the r3 storage switch (due 2025-08-18) - Ensure 2 port LACP storage bond exists for tsys3,4,5 on r3 storage switch (due 2025-08-18) - Ensure all storage interfaces/channels are linking at 1G (due 2025-08-18) - Get subopi(x) units (back) online (due 2025-08-18) - On net Cisco 2800 - Get all switches setup for remote login (currently they are console only via ultix) ### IT-Garage - Get subopi(x) units (back) online (due 2025-08-18) ## Facilities Punch List ### Facilities-Art Room - Re-hang art room door - Cleanup art room floor (scrape up paint) (due 2025-08-18) ### Facilities Server room - Deploy environmental and security sensors in server room (in progress) - Finish deploying (zwave/zigbee/proprietary) sensors (temp / humidity / door / window / alarm keypads) in server room / elsewhere - Badge control server room door - Add trim to server room door - Add stop to storage room door ### Facilities Garage - Deploy cable runners on floor (between work bench and EE desk) - Fix aircon vent hose connection to garage wall vent - Assemble, deploy de-ionizer and use TDS tester to test it's utility