Support #290
closedDeploy subo dev rack
Start date:
05/07/2025
Due date:
05/10/2025
% Done:
100%
Estimated time:
Description
-
Install power strip/top of rack switch (done)
-
Connect power strip to power and top of rack switch to network (done)
-
Install DUT power strips (done)
-
Install distribution access points (done)
-
Install first shelf (done)
-
Install second shelf (obtain more rack screws from Altex)
-
Flash, power/ethernet connect ground station units (and supporting systems)
-
Flash, power/ethernet connect payload units (and supporting systems)