Project

General

Profile

Actions

Support #290

closed

Deploy subo dev rack

Support #290: Deploy subo dev rack

Added by Charles N 7 months ago. Updated 7 months ago.

Status:
Closed
Priority:
Normal
Assignee:
Target version:
-
Start date:
05/07/2025
Due date:
05/10/2025
% Done:

100%

Estimated time:

Description

  • Install power strip/top of rack switch (done)

  • Connect power strip to power and top of rack switch to network (done)

  • Install DUT power strips (done)

  • Install distribution access points (done)

  • Install first shelf (done)

  • Install second shelf (obtain more rack screws from Altex)

  • Flash, power/ethernet connect ground station units (and supporting systems)

  • Flash, power/ethernet connect payload units (and supporting systems)

Updated by Charles N 7 months ago Actions #4

  • Status changed from New to In Progress

Updated by Charles N 7 months ago Actions #5

  • Due date set to 05/10/2025
  • Target version set to 10

Updated by Charles N 7 months ago Actions #6

  • % Done changed from 40 to 60

Updated by Charles N 7 months ago Actions #7

  • % Done changed from 60 to 100

Updated by Charles N 7 months ago Actions #8

  • Status changed from In Progress to Closed

Updated by Charles N 7 months ago Actions #10

  • Target version changed from 10 to 12

Updated by Charles N 7 months ago Actions #11

  • Target version deleted (12)
Actions

Also available in: PDF Atom