Project

General

Profile

Actions

Support #290

closed

Deploy subo dev rack

Support #290: Deploy subo dev rack

Added by Charles N 7 months ago. Updated 7 months ago.

Status:
Closed
Priority:
Normal
Assignee:
Target version:
-
Start date:
05/07/2025
Due date:
05/10/2025
% Done:

100%

Estimated time:

Description

  • Install power strip/top of rack switch (done)

  • Connect power strip to power and top of rack switch to network (done)

  • Install DUT power strips (done)

  • Install distribution access points (done)

  • Install first shelf (done)

  • Install second shelf (obtain more rack screws from Altex)

  • Flash, power/ethernet connect ground station units (and supporting systems)

  • Flash, power/ethernet connect payload units (and supporting systems)

Actions

Also available in: PDF Atom