Project

General

Profile

Actions

Support #348

closed

Support #307: IT & Facilities Punch List

OAM: Bonded 2Gbps storage connections on all hosts

Support #348: OAM: Bonded 2Gbps storage connections on all hosts

Added by Charles N 1 day ago. Updated about 15 hours ago.

Status:
Resolved
Priority:
Normal
Assignee:
Start date:
08/07/2026
Due date:
08/07/2026
% Done:

70%

Estimated time:

Description

Parent/umbrella: #307 (IT & Facilities Punch List).

Scope

  • Configure bonded 2Gbps (LACP) storage connections on all hosts
  • Verify each host's storage bond is active on the storage VLAN
  • Validate throughput on each bond

Scheduling

  • Onsite (Austin). Target: Fri 2026-08-07.

Updated by Charles N 1 day ago Actions #1

  • Target version set to Potential to Kinetic Ready

Updated by Charles N about 16 hours ago Actions #2

  • % Done changed from 0 to 100

[#348] Subsumed by [#394]. Bonded storage connections audited and fixed:

  • tsys4: 802.3ad → active-backup (USB NICs can't do LACP)
  • tsys5: g33 channel-group fixed, nic2 at 10Mbps (BUG 3 deferred)
  • tsys6/7: 2Gbps LACP confirmed healthy
    Closing as duplicate.

Updated by Charles N about 16 hours ago Actions #3

  • Status changed from New to Resolved

Updated by Charles N about 15 hours ago Actions #4

  • % Done changed from 100 to 70

Update 2026-08-07: tsys5 = 2-port LACP bond verified (nic1+nic2 up, 802.3ad). tsys6 = bond verified. tsys4 = active-backup (USB NICs cannot LACP). tsys1/3/9 = single datanet NIC only (hardware: no 2nd port). Cannot achieve 2Gbps bond without adding NICs to tsys1/3/9 - hardware procurement needed, out of scope for today.

Actions

Also available in: PDF Atom