Project

General

Profile

Actions

Feature #30

open

Environmental chamber

Added by Charles N 10 months ago. Updated about 1 month ago.

Start date:
11/22/2024
Due date:
% Done:

70%

Estimated time:

Description

Work with our outside fabrication consultants and assemble the environmental chamber.

https://www.instructables.com/Thermal-test-chamber-for-edge-of-space-testing.-D/


Files

Thermal Test Chamber for Edge of Space Testing. _ 5 Steps (with Pictures) - Instructables.pdf (4.2 MB) Thermal Test Chamber for Edge of Space Testing. _ 5 Steps (with Pictures) - Instructables.pdf webpage saved as pdf Charles N, 07/09/2025 10:10 AM
IMG_3243.jpeg (2.42 MB) IMG_3243.jpeg Charles N, 07/12/2025 11:20 PM
IMG_3241.jpeg (2.61 MB) IMG_3241.jpeg Charles N, 07/12/2025 11:20 PM
IMG_3242.jpeg (3.36 MB) IMG_3242.jpeg Charles N, 07/12/2025 11:20 PM
Thermal Test Chamber for Edge of Space Testing. _ 5 Steps (with Pictures) - Instructables.pdf
IMG_3243.jpeg
IMG_3241.jpeg
IMG_3242.jpeg
Actions #1

Updated by Charles N 2 months ago

  • Project changed from EngineeringTechops to Known Element Enterprises - Technology & Facility Services
Actions #2

Updated by Charles N 2 months ago

  • Target version set to Physical Build Out - CTO
Actions #3

Updated by Charles N 2 months ago

  • Description updated (diff)
Actions #4

Updated by Charles N 2 months ago

  • Project changed from Known Element Enterprises - Technology & Facility Services to EngineeringTechops
Actions #6

Updated by Charles N about 2 months ago

  • % Done changed from 0 to 70
Actions #8

Updated by Charles N about 1 month ago

From our fabrication consultant:

As far as I know, the remaining punch list on the chamber is as follows.

  1. Finish correcting the lid-to-chamber seal.
  2. Attach acrylic lid to foam core.
  3. glue acrylic spacers to acrylic lid, so holes can be drilled to attach original hinges.
  4. Figure out compression fittings from pipe to coil.
  5. Assemble coil.
  6. wrap reservoir, and glue protective shell in place, sealing reservoir in PVC tube.
  7. Mount blower in chamber.
  8. Run wiring and sensors.
  9. Build mounting brackets for sensor control.
Actions

Also available in: Atom PDF