Actions
Feature #30
openEnvironmental chamber
Status:
New
Priority:
Normal
Assignee:
-
Start date:
11/22/2024
Due date:
% Done:
70%
Estimated time:
Description
Work with our outside fabrication consultants and assemble the environmental chamber.
https://www.instructables.com/Thermal-test-chamber-for-edge-of-space-testing.-D/
Files
Actions
#7
Updated by Charles N about 2 months ago
- File IMG_3243.jpeg IMG_3243.jpeg added
- File IMG_3241.jpeg IMG_3241.jpeg added
- File IMG_3242.jpeg IMG_3242.jpeg added
Updated by Charles N about 1 month ago
From our fabrication consultant:
As far as I know, the remaining punch list on the chamber is as follows.
- Finish correcting the lid-to-chamber seal.
- Attach acrylic lid to foam core.
- glue acrylic spacers to acrylic lid, so holes can be drilled to attach original hinges.
- Figure out compression fittings from pipe to coil.
- Assemble coil.
- wrap reservoir, and glue protective shell in place, sealing reservoir in PVC tube.
- Mount blower in chamber.
- Run wiring and sensors.
- Build mounting brackets for sensor control.
Actions