From our fabrication consultant:
As far as I know, the remaining punch list on the chamber is as follows.
- Finish correcting the lid-to-chamber seal.
- Attach acrylic lid to foam core.
- glue acrylic spacers to acrylic lid, so holes can be drilled to attach original hinges.
- Figure out compression fittings from pipe to coil.
- Assemble coil.
- wrap reservoir, and glue protective shell in place, sealing reservoir in PVC tube.
- Mount blower in chamber.
- Run wiring and sensors.
- Build mounting brackets for sensor control.