Actions
Feature #30
openEnvironmental chamber
Feature #30:
Environmental chamber
Start date:
11/22/2024
Due date:
% Done:
70%
Estimated time:
Description
Work with our outside fabrication consultants and assemble the environmental chamber.
https://www.instructables.com/Thermal-test-chamber-for-edge-of-space-testing.-D/
Files
Updated by Charles N about 1 year ago
- Project changed from EngineeringTechops to Known Element Enterprises - Technology & Facility Services
Updated by Charles N about 1 year ago
- Target version set to Physical Build Out - CTO
Updated by Charles N about 1 year ago
- Description updated (diff)
Updated by Charles N about 1 year ago
- Project changed from Known Element Enterprises - Technology & Facility Services to EngineeringTechops
Updated by Charles N about 1 year ago
- % Done changed from 0 to 70
Updated by Charles N about 1 year ago
- File IMG_3243.jpeg IMG_3243.jpeg added
- File IMG_3241.jpeg IMG_3241.jpeg added
- File IMG_3242.jpeg IMG_3242.jpeg added
Updated by Charles N about 1 year ago
From our fabrication consultant:
As far as I know, the remaining punch list on the chamber is as follows.
- Finish correcting the lid-to-chamber seal.
- Attach acrylic lid to foam core.
- glue acrylic spacers to acrylic lid, so holes can be drilled to attach original hinges.
- Figure out compression fittings from pipe to coil.
- Assemble coil.
- wrap reservoir, and glue protective shell in place, sealing reservoir in PVC tube.
- Mount blower in chamber.
- Run wiring and sensors.
- Build mounting brackets for sensor control.
Actions