TSYS HQ Facilities Punch List

Added by Charles N 2 months ago. Updated about 10 hours ago.

Status:
In Progress
Priority:
Normal
Assignee:
Start date:
08/02/2025
Due date:
08/03/2025 (Due in 16 days)
% Done:

70%

Estimated time:

Description

Art room

  • Get OpenScan 3d scanner power supply located and paired and the system on-net for use (power supply adapter ordered)
  • Inventory art room
  • Re-hang art room door

Server room

Complicated/involved

  • (in progress) Figure out how to get all five Ultix hard drives showing up (only 3 show up currently) (need to play with BIOS/controller bios settings)
  • (in progress) Plug in hard drive bay to tsys1 to pull Axios and other data from old file server (plugged in, dmesg complained, need to investigate)
  • Deploy environmental and security sensors in server room (in progress)
  • Finish deploying (zwave/zigbee/proprietary) sensors (temp / humidity / door / window / alarm keypads) in server room / elsewhere
  • Badge control server room door

Simple

  • Plug in last two server power cables
  • Ensure the switch ports with the Dell Server secondary ethernet interfaces are set to storage vlan
  • max out ram on the best two or three Dell servers (r series) and get idrac configured so the servers can be used for RackRental / STL
  • Add trim to server room door
  • Add stop to storage room door

Garage

  • Get Suboi5 online
  • Inventory tools/equipment/machines
  • Deploy cable runners on floor
  • Fix aircon vent hose connection to garage wall vent
  • Assemble, deploy and use TDS tester to test de-ionizer

Files

580c18039de7fb78.png (424 KB) 580c18039de7fb78.png Done today Charles N, 06/18/2025 01:22 AM
da7c0d096c6e24ba.png (418 KB) da7c0d096c6e24ba.png Last nights sprint update Charles N, 06/19/2025 07:40 AM
580c18039de7fb78.png
da7c0d096c6e24ba.png

Related issues 1 (1 open0 closed)

Blocked by Known Element Enterprises - Technology Services - Support #167: Small UPS Units Re-buildIn ProgressCharles N08/02/202508/16/2025

Actions
Actions

Also available in: Atom PDF