Actions
Support #307
openIT & Facilities Punch List
Support #307:
IT & Facilities Punch List
Added by Charles N about 1 year ago. Updated 3 months ago.
Start date:
Due date:
% Done:
80%
Estimated time:
Description
Facilities work (onsite)¶
Art room¶
- Final labeling of plastic drawers (in kalaxes and under cutting table) in art room
- Get Canon Pixma Pro photo printer on air/working
- Cleanup art room floor (scrape up paint)
- Setup smart plug on 3d printers/laser
- Setup estop buttons for 3d printers/laser
- Catalog contents of dream box
Server room¶
- Document storage array setup on tsys4
- Connect EEPROM / chip programmer to pfv-tsys5 (in progress)
- Badge control server room door
- Finish deploying (zwave/zigbee/proprietary) sensors (temp / humidity / door / window / alarm keypads) in server room / elsewhere
- Link lights, smart sensors, house/server room AC units with HomeAssistant
- Garage door opener (link to HomeKit/HomeAssistant via siri)
Garage¶
- Assemble, deploy de-ionizer and use TDS tester to test the effectiveness
- Dial in reflow oven door settings on the arduino
Files
| 580c18039de7fb78.png (424 KB) 580c18039de7fb78.png | Done today | Charles N, 06/18/2025 01:22 AM | |
| da7c0d096c6e24ba.png (418 KB) da7c0d096c6e24ba.png | Last nights sprint update | Charles N, 06/19/2025 07:40 AM |
Updated by Charles N about 1 year ago
Actions
#1
- Target version set to 10
Updated by Charles N about 1 year ago
Actions
#2
- Description updated (diff)
- Status changed from New to In Progress
- % Done changed from 0 to 30
Updated by Charles N about 1 year ago
Actions
#3
- Description updated (diff)
Updated by Charles N about 1 year ago
Actions
#4
- Description updated (diff)
Updated by Charles N about 1 year ago
Actions
#5
- Description updated (diff)
Updated by Charles N about 1 year ago
Actions
#7
- % Done changed from 30 to 60
Updated by Charles N about 1 year ago
Actions
#8
- Description updated (diff)
Updated by Charles N about 1 year ago
Actions
#9
- Description updated (diff)
- Due date changed from 05/12/2025 to 05/13/2025
Updated by Charles N about 1 year ago
Actions
#10
- Description updated (diff)
Updated by Charles N about 1 year ago
Actions
#11
- Description updated (diff)
Updated by Charles N about 1 year ago
Actions
#12
- Description updated (diff)
Updated by Charles N about 1 year ago
Actions
#13
- Description updated (diff)
Updated by Charles N about 1 year ago
Actions
#14
- Description updated (diff)
Updated by Charles N about 1 year ago
Actions
#15
- Description updated (diff)
Updated by Charles N about 1 year ago
Actions
#16
- Description updated (diff)
Updated by Charles N about 1 year ago
Actions
#17
- Description updated (diff)
Updated by Charles N about 1 year ago
Actions
#18
- Description updated (diff)
Updated by Charles N about 1 year ago
Actions
#19
- Description updated (diff)
Updated by Charles N about 1 year ago
Actions
#20
- Description updated (diff)
- Due date changed from 05/13/2025 to 05/16/2025
- % Done changed from 60 to 80
Updated by Charles N about 1 year ago
Actions
#21
- Description updated (diff)
Updated by Charles N about 1 year ago
Actions
#22
- Description updated (diff)
Updated by Charles N about 1 year ago
Actions
#23
- Description updated (diff)
Updated by Charles N about 1 year ago
Actions
#25
- Target version changed from 10 to 12
Updated by Charles N about 1 year ago
Actions
#26
- Description updated (diff)
Updated by Charles N about 1 year ago
Actions
#27
- Description updated (diff)
Updated by Charles N about 1 year ago
Actions
#28
- Due date changed from 05/16/2025 to 05/18/2025
Updated by Charles N about 1 year ago
Actions
#29
- Due date changed from 05/18/2025 to 06/01/2025
Updated by Charles N about 1 year ago
Actions
#30
- Due date changed from 06/01/2025 to 05/18/2025
Updated by Charles N about 1 year ago
Actions
#31
- Description updated (diff)
Updated by Charles N about 1 year ago
Actions
#32
- Description updated (diff)
Updated by Charles N about 1 year ago
Actions
#33
- Description updated (diff)
Updated by Charles N about 1 year ago
Actions
#34
- Description updated (diff)
Updated by Charles N about 1 year ago
Actions
#35
- Description updated (diff)
Updated by Charles N about 1 year ago
Actions
#36
- Due date changed from 05/18/2025 to 05/31/2025
Updated by Charles N about 1 year ago
ยท Edited
Actions
#37
- Description updated (diff)
Completed so far
Also see my mastadon posts for screenshots as I check off things in Apple reminders from the punch list. Not a perfect 1:1 with here, i try to keep it synced.
- Install and connect to coresw tsys1 storage network USB3 Gigabit adapter
- Install and connect to coresw tsys2 storage network USB3 Gigabit adapter
- Deploy desktop switch onto art room cabinet
- Deploy USB hub on art room cabinet and cable up devices and cable hub to laptop
- Move unifi ap uplinks to coresw
- Plug in dev board USB connections to ultix
- Balance server room loads across the two UPS units
- Move tsys1 / external hard drive to it's production location
- Plug server room UPS monitoring USB cables into tsys1
- Get zwave radio/network setup in pfv-bms
- Get zigbee radio/network setup in pfv-bms
- Get tsys-ca VM working
- ssh audit/harden ( https://github.com/jtesta/ssh-audit?tab=readme-ov-file#web-front-end )
- Forward/reverse DNS for all hosts
- Syslog working for all hosts
- Finalize dhcp client config to remove name servers/search domains
- Adopt Unifi APs to unifi controller on tsys2
- Qualify all hard drives (in progress)
- Plug in UPS1 USB cable to tsys2
- Plug in UPS2 UPS UPS UPS cable to tsys2
- Label all tsys2 external hard drives with matching names on the drive and in Windows
- Qualify lead acid cells in garage
- Validate r1,r2 switch daisy chaining to Cisco 2800 lan port
- Move tsys2 from garage
- Factory reset Cisco 2800
- Flash pi avionics units
- Flash pi server room door controller / NTP unit
- Deploy unifi controller on tsys2
- Uninstall all apps from tsys1 external hard drive and setup for new user id/ownership
- Deploy stick cams for external surveillance
- Flash subopi units
- Deploy Govee units (garage and art room )
- Get downstairs entertainment area on network
- Move tsys1 to art room
- Create email alias for home automation account
- Get govee units back online
- Deploy stick cameras
- Replace batteries on all sensors
- Get LED strips online in server room racks
- Cable manage usb/power in RF shelf of R&D rack
- Clear out extra RackRental items to storage
- Put long VGA cable in server room from KVM in rack to monitor on desk
- Replace EE bench camera VGA cable with medium length cable from server room
- Finish software install on stlpc-artroom-workbench
- Install and connect r&d stor storage bond (ports 20-23) to core storage bond (ports 13-16)
- Install ethernet four port gigabit NIC into ultix
- Deploy Home assistant VM on stlpc-garage-ee
- Install and connect to core sw ultix storage bond (ports 13-16) 4 port intel nic into Ultix
- Get wii video output working
- Cable management in server room
- Deploy all clean room fabrication capabilities (CNC,laser,3d print, sewing, embroidery, leather working, stamps etc)
- Plug in video for second monitor in garage
- Get upstairs receiver mounted above couch
- Get upstairs speakers positioned and and wired / cable managed to receiver
- Connect fire stick video out to receiver hdmi in and projector video in to receiver hdmi out
Updated by Charles N about 1 year ago
Actions
#38
- Description updated (diff)
Updated by Charles N about 1 year ago
Actions
#39
- Description updated (diff)
Updated by Charles N about 1 year ago
Actions
#40
- Subject changed from Infra Punch List to Starting Line Productions / TSYS HQ Build out for production todo
- Description updated (diff)
Updated by Charles N about 1 year ago
Actions
#41
- Description updated (diff)
Updated by Charles N about 1 year ago
Actions
#43
- Blocked by Support #167: Small UPS Units Re-build added
Updated by Charles N about 1 year ago
Actions
#44
- % Done changed from 80 to 90
Updated by Charles N about 1 year ago
Actions
#45
- Description updated (diff)
Updated by Charles N about 1 year ago
Actions
#46
- Description updated (diff)
Updated by Charles N about 1 year ago
Actions
#47
- Description updated (diff)
Updated by Charles N about 1 year ago
Actions
#48
- Description updated (diff)
Updated by Charles N about 1 year ago
Actions
#49
- Target version deleted (
12)
Updated by Charles N about 1 year ago
Actions
#50
- Target version set to 13
Updated by Charles N about 1 year ago
Actions
#51
- Target version deleted (
13)
Updated by Charles N about 1 year ago
Actions
#52
- Target version set to Physical Build Out - VpTechops
Updated by Charles N about 1 year ago
Actions
#53
- File 580c18039de7fb78.png 580c18039de7fb78.png added
Updated by Charles N about 1 year ago
Actions
#54
- Description updated (diff)
Updated by Charles N about 1 year ago
Actions
#55
- Description updated (diff)
Updated by Charles N about 1 year ago
Actions
#56
- Due date changed from 05/31/2025 to 06/30/2025
Updated by Charles N about 1 year ago
Actions
#57
- File da7c0d096c6e24ba.png da7c0d096c6e24ba.png added
Updated by Charles N about 1 year ago
Actions
#58
- Description updated (diff)
Updated by Charles N about 1 year ago
Actions
#59
- Description updated (diff)
Updated by Charles N about 1 year ago
Actions
#60
- Description updated (diff)
Updated by Charles N about 1 year ago
Actions
#61
- Description updated (diff)
Updated by Charles N about 1 year ago
Actions
#62
- Description updated (diff)
Updated by Charles N about 1 year ago
Actions
#63
- Description updated (diff)
Updated by Charles N about 1 year ago
Actions
#64
- Description updated (diff)
Updated by Charles N about 1 year ago
Actions
#65
- Description updated (diff)
Updated by Charles N about 1 year ago
Actions
#66
- Description updated (diff)
Updated by Charles N about 1 year ago
Actions
#67
- Description updated (diff)
Updated by Charles N about 1 year ago
Actions
#68
- Description updated (diff)
Updated by Charles N about 1 year ago
Actions
#69
- Description updated (diff)
Updated by Charles N about 1 year ago
Actions
#70
- Description updated (diff)
Updated by Charles N about 1 year ago
Actions
#71
- Description updated (diff)
Updated by Charles N about 1 year ago
Actions
#72
- Description updated (diff)
Updated by Charles N about 1 year ago
Actions
#73
- Description updated (diff)
Updated by Charles N about 1 year ago
Actions
#74
- Subject changed from Starting Line Productions / TSYS HQ Build out for production todo to Starting Line Productions / TSYS HQ Build out - onsite/physical punch list
Updated by Charles N about 1 year ago
Actions
#75
- Due date changed from 06/30/2025 to 07/31/2025
Updated by Charles N about 1 year ago
Actions
#76
- Description updated (diff)
Updated by Charles N about 1 year ago
Actions
#77
- Description updated (diff)
Updated by Charles N about 1 year ago
Actions
#78
- Description updated (diff)
Updated by Charles N about 1 year ago
Actions
#79
- Subject changed from Starting Line Productions / TSYS HQ Build out - onsite/physical punch list to TSYS HQ Build out
- Description updated (diff)
Updated by Charles N about 1 year ago
Actions
#80
- Description updated (diff)
Updated by Charles N about 1 year ago
Actions
#81
Completed:
- Ensure all Ecobee sensors are (optimally) deployed
Updated by Charles N about 1 year ago
Actions
#82
- Description updated (diff)
Updated by Charles N about 1 year ago
Actions
#83
- Description updated (diff)
Updated by Charles N about 1 year ago
Actions
#84
Completed
- Get all subopi units on-net (done except for subopi5 which seems to have a bad usb power socket)
Updated by Charles N about 1 year ago
Actions
#85
- Subject changed from TSYS HQ Build out to TSYS HQ IT Build out - Server Room Punch List
Updated by Charles N 12 months ago
Actions
#115
- Blocked by deleted (Support #167: Small UPS Units Re-build)
Updated by Charles N 12 months ago
Actions
#116
- Blocked by Support #167: Small UPS Units Re-build added
Updated by Charles N 12 months ago
Actions
#125
- Description updated (diff)
Completed:
-
max out ram on the fastest/most CPU on the R Series Dell servers and get idrac configured so the servers can be used for RackRental / STL (one server online as of 2025-07-21) examining/assembling the rest 2025-07-22
-
Plug in last two server power cables
Updated by Charles N 12 months ago
Actions
#127
- Description updated (diff)
Completed:
We ran out of space on the management switch in r3. So we had to steal some ports from the storage switch for mgmt interfaces.
- Ensure the storage switch ports with the management ethernet interfaces are set to management vlan
Updated by Charles N 11 months ago
Actions
#155
- Description updated (diff)
Completed 2025-08-18:
- Ensure the two ports that the ultix storage NIC is connected to are in a bond on storage VLAN on pfv-core-sw01
- Ensure 2 port LACP storage bond exists for tsys3,4,5 on r3 storage switch
- Ensure tsys3,4,5 have two of their four interfaces connected to the r3 storage switch
Actions