Support #307

open

IT & Facilities Punch List

Added by Charles N 4 months ago. Updated 16 days ago.

Status:
In Progress
Priority:
Normal
Assignee:
Start date:
08/05/2025
Due date:
09/30/2025 (Due in 24 days)
% Done:

70%

Estimated time:

Description

Todo 2025-08-20

  • Get subopi(x) units in garage (back) online
  • Get subopi(x) units in server room (back) online
  • Ensure all storage interfaces/channels are linking at 1G
  • Move extra 1TB drives from ultix to tsys2 external drive bays
  • Plug in 3TB hard drive to tsys1 to pull Axios and other data from old file server drive images (drive was plugged in, tried two different usb -> sata adapters, dmesg complained, need to troubleshoot (drive was recognized on reboot though and hung the boot)

Art Room

  • Give art room canon multi function unit a static IP address (in progress, powered it on, connected to USB to re-run setup). (due 2025-08-18)
  • Catalog contents of dream box
  • Cleanup art room floor (scrape up paint)

Garage

  • Label everything appropriately in garage
  • Fix big fan (blade has come off due to vibrations)
  • Deploy cable runners on floor (between work bench and EE desk)
  • Fix aircon vent hose connection to garage wall vent
  • Assemble, deploy de-ionizer and use TDS tester to test the effectiveness

Server Room

  • Deploy environmental and security sensors in server room (in progress)

  • Finish deploying (zwave/zigbee/proprietary) sensors (temp / humidity / door / window / alarm keypads) in server room / elsewhere

  • Badge control server room door

  • Setup NUT in home assistant to pull from the tsys1 NUT server

  • Link lights, smart sensors, house/server room AC units with HomeAssistant

  • Garage door opener (link to HomeKit/HomeAssistant via siri)

  • Migrate data from ZFS file server hard drive on tsys1 to tsys2 file server/nextcloud

  • On net Cisco 2800

  • Get all switches setup for remote login (currently they are console only via ultix)


Files

580c18039de7fb78.png (424 KB) 580c18039de7fb78.png Done today Charles N, 06/18/2025 01:22 AM
da7c0d096c6e24ba.png (418 KB) da7c0d096c6e24ba.png Last nights sprint update Charles N, 06/19/2025 07:40 AM
580c18039de7fb78.png
da7c0d096c6e24ba.png

Related issues 1 (1 open0 closed)

Blocked by Known Element Enterprises - Technology & Facility Services - Support #167: Small UPS Units Re-buildIn ProgressCharles N08/05/202508/09/2025